Replacement of River Crossing Loops

Replacement of River Crossing Loops (Al-Khabour & Euphrates)

ClientSyrian Co. For Oil Trasport (SCOT) / Tartous
LocationSyria
Date26/05/2011
Contract No45/2011

Project Information

Complex replacement project for corroded pipeline loops at the Al-Khabour and Euphrates river crossings.

Scope of Work

Replacement of corroded loops- Welding, excavation, lowering- Full pipeline installation- Valves, coating, isolation joints, magnesium anodes

Construction Planning

In 2011, R&T carried out a complex river-crossing pipeline replacement project involving procurement, installation, testing, and commissioning of new pipeline loops at Al-Khabour and Euphrates rivers. The work included excavation, welding, lowering, coating, valve installation, isolation joints, and magnesium anodes. This project improved safety, corrected corrosion issues, and extended the operational lifespan of critical transport pipelines.