R&T was commissioned in 2006 to prepare an in-depth technical and economic feasibility study for the construction of a major marine jetty at Banias Terminal. The study covered the full conceptual design, including eight oil tanks, pumping stations, fire-fighting systems, control and instrumentation networks, and both onshore and offshore pipeline systems. This comprehensive analysis provided […]
R&T completed the repair of corroded points along the 24-inch crude oil pipeline, executing the work without stopping the pumping process. This required precise planning and safe on-line intervention to restore pipeline integrity. The successful completion reduced operational risk and ensured continuous crude oil flow along this vital supply route. Work Location: 554 at tanks […]
In 2011, R&T carried out a complex river-crossing replacement project, involving the procurement, installation, testing, and commissioning of new pipeline loops at the Al-Khabour and Euphrates rivers. The work included excavation, welding, lowering, coating, valve installation, isolation joints, and magnesium anodes. This project improved safety, corrected corrosion issues, and extended the operational lifespan of critical […]