Replacement of River Crossing Loops

/
In 2011, R&T carried out a complex river-crossing replacement project, involving the procurement, installation, testing, and commissioning of new pipeline loops at the Al-Khabour and Euphrates rivers. The work included excavation, welding, lowering, coating, valve installation, isolation joints, and magnesium anodes. This project improved safety, corrected corrosion issues, and extended the operational lifespan of critical […]

Intelligent Inline Inspection– 26” Pipeline

/
R&T conducted an inline intelligent inline inspection for the 26-inch pipeline. Using advanced tools to detect corrosion, dents, laminations, and anomalies, the project provided a complete pipeline integrity assessment. A detailed evaluation report and repair recommendations were delivered, enabling SCOT to plan and prioritize maintenance activities based on accurate, high-resolution data.

Intelligent Inline Inspection– 22” Pipeline

/
Executed in parallel with the 26-inch line, R&T completed an intelligent inline inspection assessment on the 22-inch pipeline. The inspection covered full anomaly detection and produced a complete structural and operational technical evaluation. The project improved safety, ensured compliance, and supported the long-term health of the national pipeline network.

24” Pipeline Construction

/
R&T, working jointly, constructed a 24-inch gas pipeline. The project included field construction, pipeline installation, mechanical works, and safety integration. This assignment contributed to expanding the national gas transmission grid.

Replacing 10” Corroded River Crossing Line with New 6” Pipeline

/
R&T replaced a corroded 10-inch river crossing pipeline segment with a new 6-inch line, addressing critical safety and operational issues. The work involved supplying specialized equipment, ensuring safe installation, and delivering a fully rehabilitated pipeline section designed for long-term reliability.

Ethanol & Methanol Production Plant – Green Field

/
In 2024, R&T completed a full EPC-style project for the construction, supply, and installation of an ethanol and methanol production plant. This project represents a modern industrial development in Syria, integrating mechanical systems, process equipment, and production lines. Delivered as a complete greenfield facility, it expanded local industrial capacity and introduced new production capabilities to […]